Thursday 21 June 2018

National Cycle Network

Look at the junction of CS6 and NCN4 at the south end of Blackfriars Bridge. Impossible to switch from one to t'other without either cycling across a pedestrian crossing or running a red light (there being no green phase for that turn)

Also NCNs are signed in miles and LCN in minutes - sometimes on the same signpost.